How to Compare Contractor Quotes for a Bathroom or Kitchen Remodel
Why quotes for the same remodel can be thousands apart
Two honest contractors can look at the same bathroom and quote very different prices. Before you assume one is overcharging, check for these common causes:
- They pictured different projects. "Redo the bathroom" can mean new paint and fixtures, or new waterproofing, tile, lighting and ventilation. Without a written scope, each contractor fills in the gaps differently.
- Allowances. An allowance is a placeholder budget for things you haven't picked yet, like tile or a vanity. A quote with a $600 tile allowance looks cheaper than one with $2,500, but you'll pay the difference later if you choose nicer tile.
- Exclusions. Permits, debris removal, drywall repair, painting, electrical upgrades and fixture purchases are easy to leave out. One bid might include them and another might quietly not.
- Unknown conditions. What's behind the walls and under the floor is a risk. Some contractors price that risk into the bid; others exclude it and handle it as a change order later.
- How the business runs. Insurance, licensing, warranty, crew vs. subcontractors, and how busy they are all show up in the price.
Step 1: Write one scope and send it to everyone
The single biggest improvement is giving every contractor the same written description of the work. A useful scope covers:
- What stays, what gets replaced, and what gets removed: fixtures, cabinets, flooring, walls.
- Layout changes, if any. Moving a toilet, shower or sink drain changes the price a lot.
- Who buys which materials, and the finish level you expect.
- Rough dimensions, your target start date, and any access limits, like pets, working hours or a single bathroom in the house.
- What you want priced separately as options, so they don't blur into the base price.
Ask each contractor to price exactly that scope and to list anything they'd change or anything they think is missing, rather than quietly pricing a different job.
Step 2: Ask for the same price breakdown
A single lump sum hides the differences. Ask every bidder to split the base price into the same categories, for example: demolition and disposal; framing and drywall; plumbing; electrical; ventilation; waterproofing and tile; fixtures and cabinetry installation; painting and finishes; permits and inspections; and general conditions like protection, cleanup and supervision.
When every bid uses the same categories, you can see where they really differ. If one contractor's plumbing line is half of everyone else's, ask what they left out.
Step 3: Put every bid on the same allowances
Pick one realistic allowance for each item you haven't chosen yet, then adjust each bid to match. Here's an illustrative example with made-up numbers:
| Bid | Quoted | Tile allow. | Permit | Adjusted* |
|---|---|---|---|---|
| A | $18,400 | $1,500 | Included | $18,900 |
| B | $16,900 | $600 | Excluded (~$400) | $18,700 |
| C | $21,000 | $2,500 | Included | $20,500 |
*Each bid adjusted to a $2,000 tile allowance with the permit included.
Contractor B looked $1,500 cheaper than A. After matching the allowance and adding the excluded permit, the two are about $200 apart, and the real question becomes which contractor you trust more.
Step 4: Line up the exclusions
Make a simple list of everything each bid excludes or doesn't mention. Anything not written down should be treated as not included until the contractor confirms it in writing. Common gaps: permits, haul-away, patching and painting adjacent walls, electrical panel or circuit upgrades, subfloor repair, and buying the fixtures themselves.
Step 5: Compare the terms, not just the total
- Schedule: start date and expected duration.
- Payment schedule: deposit size and what each payment is tied to. Payments tied to finished milestones protect you better than payments tied to dates.
- Change orders: how extra work gets priced and approved. In writing, before the work, is the standard to ask for.
- Warranty: what's covered and for how long.
- Permits: who pulls them and who handles the inspections.
Step 6: Check the contractor, not just the price
Confirm insurance and any required license or registration, and ask for recent references from similar projects. Requirements vary by state and city, so check your local rules.
Red flags worth a second look
- A bid far below the others with no clear explanation.
- A one-line quote with no breakdown, no allowances and no exclusions.
- Pressure to sign immediately or pay a large deposit in cash.
- No written contract, or a contract that doesn't match what you discussed.
How many quotes should you get?
Three is a common target. It's enough to spot an outlier without spending weeks on site visits. More quotes don't help much if they're pricing different jobs. Three quotes on the same scope beat six quotes on six different ideas of the project.
Want to save money? Ask for options, priced separately
If the bids come in over budget, don't just ask for a lower number. Ask each contractor to price specific alternatives as credits against the base bid, like a prefabricated shower base instead of a custom tiled pan, or keeping the existing vanity. Write them down separately so you can see what each change saves, and watch for options that overlap so you don't count the same savings twice.
Do this in about 15 minutes
RenoPacket asks you about your bathroom or kitchen one question at a time and writes the contractor scope, a private list of savings options, and a bid comparison worksheet for you. Planning is free; the full packet is $4.99.
Start planning your project →Frequently asked questions
Should I always pick the lowest quote?
Not until the quotes are comparable. Once every bid prices the same scope with the same allowances, a lower price is a real difference. Before that, it often means something was left out.
Is it OK to share one contractor's quote with another?
It's usually better to share your scope, not a competitor's price. A shared scope gets you comparable bids; sharing prices tends to anchor everyone to one number.
What's the difference between an allowance and a fixed price?
A fixed price covers a specific, chosen item. An allowance is a budget placeholder for something you haven't chosen yet. If you spend more than the allowance, you usually pay the difference; if you spend less, you should get a credit.
This guide is general information to help you plan. It isn't legal, engineering or construction advice. Check your local codes, permit rules and contractor requirements.